First we started with Electrical in the living Room & putting a light at the
bottom of the stairs by the lavender so people can see at night. At the same
time I put a lighted switch at the bottom of the stairs. I also put an electric
outlet on the porch next to the front door.
Then we ripped out the entire kitchen. More electrics, plumbing & cabinets. Wow,
did we spend some €s.
This is a deep cut
I had to chisel out
for the wires.
|
|
|
|
Opening is from floor
with hole drilled to cave
to just below ceiling
|
|
Wire will go in Flex Tubing
to protect them & allow
for easy replacement
|
|
|
|
Now it's time to
close the hole
|
|
I tried to save the
tiles, lost a few
|
Look how thick this is
Twice as thick as Hammer
|
Frig will go here on left
with oven tower on right.
|
|
|
Sink unit will be
farther left against pillar.
|
Only one more evening with a sink
to wash up & cock top to cook
|
Bar top is gone.
New cabinets about ready.
|
Now the sink & cock top are gone
|
|
Now it's time to
pull more electric
|
|
Now after alot of work,
drain, water & propane
lines are in
|
|
|
Sink unit in
Cabinets ready for stove top
|
Denis doing last
tightening of drain
|
Oven & Stove top is in!
Now we can cook again!
|
Pantry unit in place
coffee stand to left.
|
|
|
|
Microwave is in use
again with electric
completed
|
|