Remodeling to an American Kitchen

First we started with Electrical in the living Room & putting a light at the bottom of the stairs by the lavender so people can see at night. At the same time I put a lighted switch at the bottom of the stairs. I also put an electric outlet on the porch next to the front door.
Then we ripped out the entire kitchen. More electrics, plumbing & cabinets. Wow, did we spend some €s.
This is a deep cut
I had to chisel out
for the wires.   
 Opening is from floor
with hole drilled to cave
 to just below ceiling
Wire will go in Flex Tubing
to protect them & allow
for easy replacement
Now it's time to
close the hole
I tried to save the
tiles, lost a few
Look how thick this is
Twice as thick as Hammer
Frig will go here on left
with oven tower on right.
Sink unit will be
farther left against pillar.
Only one more evening with a sink
to wash up & cock top to cook
Bar top is gone.
New cabinets about ready.
Now the sink & cock top are gone
Now it's time to
pull more electric
Now after alot of work,
drain, water & propane
lines are in
Sink unit in
Cabinets ready for stove top
Denis doing last
tightening of drain
Oven & Stove top is in!
Now we can cook again!
Pantry unit in place
coffee stand to left.
Microwave is in use
again with electric
  completed